1. Construction of UKS 1-6 at the Shurtan field (6 objects);
2. Construction of UKS 1-2 at the Samantepa field (2 objects);
3. Construction of a backup power plant - a gas piston power plant (GPPP) at CS-5 UMG Gazli;
4. Reconstruction of compressor station KS-1 of Kagan UMG;
5. Construction of a pipeline for regenerated fuel gas from the installation to the boiler house of the rotational camp "ShGHK".


