Automation of control systems

Service:

  • Technical (routine) maintenance of systems;

  • Scheduled preventive maintenance (SPM) of systems;

  • Service, restoration and adjustment of software and hardware systems;

  • Repair work (major/medium) of control system components.

New projects:

  • Engineering survey work;

  • Design and development of software and hardware systems:

- automated process control systems, including automated control systems and regulations and SCADA;

- control and accounting of products and energy resources;

- operational dispatch control.

  • Selection and provision of equipment and components within the framework of the project;

  • Carrying out installation and commissioning works;

  • Technical support for examination and author's supervision.

  • Service

    1. Service/technical maintenance at technological facilities of the Mubarek NGDU, Shurtan NGDU, Gazli NGDU, Ustyurt GDU, MGPZ (UPPBS, UTsOG, SOU, UKPG, UPPG);

    2. Service/technical maintenance at the DKS (booster compressor stations), UKS (wellhead compressor stations) of the Mubarek NGDU, Shurtan NGDU, Gazli NGDU, Ustyurt GDU, MGPZ;

    3. Repair, restoration and adjustment of automation systems at 18 technological facilities;

    4. Repair, restoration and adjustment of automation systems at 23 DKS;

  • New projects

    1. Engineering, commissioning and putting into operation of an automated process control system for desulphurization units No. 19, 20, 21 of workshop No. 14 of the Moscow Gas Processing Plant;

    2. Reconstruction of the automated process control system of the 4th technological line of the Gazli gas processing plant (2025)

    3. Modernization of the automated process control system for the integrated gas treatment plant at the Alan field of the Mubarek oil and gas production department (2024);

    4. Construction of a plant for extracting sulfur from sulfur dioxide gas at workshop No. 5 of the Moscow Gas Processing Plant, including installation and adjustment of instrumentation and automation (2023);

    5. Modernization of the automated process control system of the 4th line of the propane-butane mixture production unit (UPPBS) of the Gazli NGDU;

    6. Modernization of the automated process control system, instrumentation and automation systems and substations of boiler house No. 2, workshop 15, Mubarek Gas Processing Plant;

    7. Modernization of automated process control systems for 12 compressor units (2022–2024);

    8. Development, production, supply and implementation of the software and hardware complex of the SCADA system for operational dispatch control (ASDCU) of the Gazli NGDU (2025)

    9. Development, manufacture, supply and implementation of the software and hardware complex of the SCADA system for operational dispatch control (ASDCU) of the Mubarek NGDU (2025)