Modernization of the Shurtan boiler house with the replacement of obsolete boiler-furnaces (2kt) and the introduction of an automated process control system at the Shurtan NGDU (2025);
Installation of a chimney and reconstruction of the gas shaft of Boiler House No. 2 at the Mubarek Gas Processing Plant (2023);
Modernization of the automated process control system of Boiler House No. 2 at the Mubarek Gas Processing Plant (2023);
Modernization of the chemical water treatment system (CWT) of the boiler house of the Mubarek Gas Processing Plant (2023);
Construction and installation works of boiler house No. 6 of Gazli NGDU (2022).